Ïã¸ÛÁùºÏ²Ê¿ª½±½á¹û2023

OUR WORK MATTERS.

Portfolio

REID HEALTH ENT BUILDING

Healthcare

REID HEALTH ENT BUILDING

This project involved the construction of a new 18,000 SF, single story medical building housing ear, nose and throat specialists. The building includes spaces for exam rooms, physician offices, specialty testing rooms, conference/education rooms, break room, and reception area. This 10-month, $5.2 million project was completed in December 2016.
Client Reid Health
Location Richmond, IN
Square Footage 18,000.00
Project Budget $4.7 Million
UTLEY CREEK WRF ODOR CONTROL

Water Resources

UTLEY CREEK WRF ODOR CONTROL

Installation of a new odor control biofilter and carbon absorber along with all associated odor piping. New aluminum odor control covers were installed at the Influent Pump Station and junction boxes. Along with the construction of a new dumpster building at the Influent Pump Station, two (2) bar screens were replaced along with a shaftless screw conveyor, and a grit cyclone. A new MIC coating system was applied to the junction boxes and Influent Pump Station.
Client Town of Holly Springs
Location Holly Springs, NC
Square Footage
Project Budget $4.2 Million
PHILPOTT WATER FILTRATION PLANT UPGRADE

Water Resources

PHILPOTT WATER FILTRATION PLANT UPGRADE

Upgrade of existing WTP to increase plants capacity from 4MGD to 6MGD. Includes addition of new sand/anthracite filter, rehab of 4 existing filters, installation of tube settlers and sludge removal equipment, construction of new clearwell w/ associated FW pumps and piping, construction of new RW Intake with SS screens and air burst system.
Client Henry County Public Service Authority
Location Philpott, VA
MGD 6.00
Project Budget $11.7 Million
GASTONIA TWO RIVERS WATER TREATMENT FACILITY

Water Resources

GASTONIA TWO RIVERS WATER TREATMENT FACILITY

Construction of a 12 MGD GE Membrane, installation and associated pumps, air system, blowers, strainers, instrumentation, and other equipment. The project also included replacement of all chemical systems, new sludge removal equipment, sludge holding tank upgrades, new mixers, new bridge crane, and miscellaneous upgrades and repairs to existing facility.
Client Two Rivers Utilities
Location Gastonia, NC
MGD 12.00
Project Budget $16.4 Million
INTEGRATED SCIENCES BUILDING & CUNNINGHAM HALL RESEARCH EXPANSION

Education

INTEGRATED SCIENCES BUILDING & CUNNINGHAM HALL RESEARCH EXPANSION

Expansions contain the laboratories, offices, and laboratory support areas following an interdisciplinary approach for materials science research and biology.
Client Kent State University
Location Kent, OH
Square Footage 15,640.00
Project Budget $6.4 Million
CARROLLTON NEW 6-12 (SEGMENTED)

Education

CARROLLTON NEW 6-12 (SEGMENTED)

The 6-8 middle school portion consists of 66,366 SF while the high school portion is 99,327 SF. The new school building was built on the school’s 177-acre Board Office/Athletic Complex site. Also included in the scope was the abatement and demolition of two elementary schools and the middle school.
Client Carrollton Exempted Village Schools
Location Carrollton, OH
Square Footage 165,693.00
Project Budget $36.5 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon